| 000 | 01169cam a2200277 i 4500 | ||
|---|---|---|---|
| 008 | 760319t1975 dcuaaaaerb 000 0 eng | ||
| 020 | _a0844731927 : | ||
| 040 |
_aDLC _cDLC |
||
| 050 | 0 | 0 |
_aHD9698.U52 _bC43 |
| 082 | 0 | 0 |
_a621.48'32 _bCHO |
| 100 | 1 | _aChow, Brian G. | |
| 245 | 1 | 4 |
_aThe Liquid Metal Fast Breeder reactor: _bAn Economic Analysis/ |
| 260 |
_aWashington, D.C.: _bAmerican Enterprise Institute for Public Policy Research, _c1975. |
||
| 300 | _a76 p.:ill, | ||
| 440 | 0 | _aNational energy study; | |
| 500 | _aOn cover: National Energy Project. | ||
| 504 | _aIncludes bibliographical references. | ||
| 520 | _aThis study primarily deals with: 1) background for the assessment of the liquid metal fast breeder reactor program. 2) discount rate. 3) uranium supply schedules. 4) plant capacities, electrical energy demand, and plant mix; and 5) cost projections by the atomic energy commission. Chapter 6 concludes the study. | ||
| 590 | _ane 25/04/2018 | ||
| 591 | _aLoan | ||
| 650 | 0 | _aNuclear Industry. | |
| 650 | 0 | _aLiquid Metal Fast Breeder Reactors. | |
| 710 | 2 | _aAEI National Energy Project. | |
| 942 |
_2ddc _cBOOK |
||
| 949 | _a621.48'32 CHO | ||
| 999 |
_c8084 _d8084 |
||