000 01057cam a22003134a 4500
008 000119s2000 dcua b i000 0 eng
020 _a0821346822
020 _a9780821346822
040 _aDLC
_cDLC
050 0 0 _aHG3881.5.W57
_bU33 2000
082 0 0 _a338.91'096761
245 0 0 _aUganda :
_bpost-conflict reconstruction : country case evaluation /
260 _aWashington, D.C. :
_bWorld Bank,
_c2000.
300 _axiv, 80 p. :
440 0 _aCountry case study series
500 _aAt head of title: World Bank Operations Evaluation Department, OED.
504 _aIncludes bibliographical references (p. 79-80).
520 _aThis case study assesses the World Bank's experience in assisting post-conflict reconstruction in Uganda.
590 _aosc 26/8/16
591 _aLoans
650 0 _aEconomic assistance - Uganda
650 0 _aWorld bank - Uganda
650 0 _aUganda - economic conditions
651 0 _aUganda
700 1 _aKreimer, Alcira.
710 2 _aWorld Bank.
942 _2ddc
_cBOOK
949 _a338.91'096761 UGA
999 _c4583
_d4583