| 000 | 01338cam a2200313 i 4500 | ||
|---|---|---|---|
| 008 | 150303s2015 enka b 001 0 eng | ||
| 020 | _a9781118631171 (cloth : alk. paper) | ||
| 020 | _a111863117X | ||
| 040 |
_aDLC _cDLC |
||
| 050 | 0 | 0 |
_aHD9715.A2 _bK443 2015 |
| 082 | 0 | 0 |
_a690.068'5 _bKEA |
| 100 | 1 | _aKeane, P. J. | |
| 245 | 1 | 0 | _aDelay analysis in construction contracts / |
| 250 | _a2nd edition. | ||
| 260 |
_aChichester, West Sussex, United Kingdom : _aHoboken, NJ : _bJohn Wiley and Sons, Inc., _c2015. |
||
| 300 | _axiv, 274 pages ; 25 cm | ||
| 504 | _aIncludes bibliographical references and index. | ||
| 520 | _aThe most significant unanticipated costs on many construction projects are the financial impacts associated with delay and disruption to the works. Assessing these, and establishing a causal link from each delay event to its effect, contractual liability and the damages experienced as a direct result of each event, can be difficult and complex. | ||
| 590 | _aoif 21/01/2020 | ||
| 591 | _aLoans | ||
| 650 | 0 | _aConstruction industry--Planning | |
| 650 | 0 | _aConstruction industry--Cost control | |
| 650 | 0 | _aProduction scheduling. | |
| 650 | 0 | _aConstruction contracts.--Costs | |
| 650 | 0 | _aPenalties, Contractual | |
| 700 | 1 | _aCaletka, A. F. | |
| 942 |
_2ddc _cBOOK |
||
| 949 | _a690.068'5 KEA | ||
| 999 |
_c16763 _d16763 |
||