| 000 | 00897cam a22002171 4500 | ||
|---|---|---|---|
| 008 | 720728t1967 enka er 000 0 eng | ||
| 040 |
_aDLC _cOClU |
||
| 050 | 0 | 0 |
_aHD69.P7 _bM64 1967 |
| 082 |
_a658.5'02 _bMOR |
||
| 100 | 1 | _aMorris, L. N. | |
| 245 | 1 | 0 |
_aCritical path : _bconstruction and analysis / |
| 250 | _a1st ed. | ||
| 260 |
_aOxford ; _aNew York : _bPergamon Press, _cc1967. |
||
| 300 | _avii, 114 p. :ill, | ||
| 520 | _aThis volume is an introduction to the critical-path method of scheduling primarily intended for managers. The book covers the types of projects that can be analysed by the critical-path technique and briefly describes the logic and construction of networks, the principal analytical tool in using the critical-path method. | ||
| 590 | _alje 08/10/2018 | ||
| 591 | _aLoans | ||
| 650 | 0 | _aCritical path analysis. | |
| 942 |
_2ddc _cBOOK |
||
| 949 | _a658.5'02 MOR | ||
| 999 |
_c10419 _d10419 |
||