Central Bank of Nigeria Library

Image from Google Jackets

The Economic Choice Between Hydroelectric and Thermal Power Developments: With a note on joint costs in multipurpose projects/

By: Material type: TextTextSeries: World Bank Staff Occasional PapersPublication details: Washington : International Bank for Reconstruction and Development; distributed by Johns Hopkins Press, c1966.Description: x, 70 p.:illSubject(s): DDC classification:
  • 338.4762131213 TAK
LOC classification:
  • HD9685.A2 T3
Summary: Firstly, this paper deals with one of the most commonly experienced problems of choice in a developing country, when the decision is whether to make a large investment in hydro power now or a series of smaller investments in thermal power later. It is the purpose of this paper to set down in a systematic way a logically correct method for handling the economic comparison of alternative power developments. It deals with the problem of comparing alternative developments of a power system to supply a projected demand for power, with specific load characteristics that must be met.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Copy number Status Date due Barcode
Monograph & others Monograph & others CBN HQ Library General Stacks Non-fiction 338.4762131213 TAK (Browse shelf(Opens below)) c.1 Available 31008100145396
Monograph & others Monograph & others CBN HQ Library General Stacks Non-fiction 338.4762131213 TAK (Browse shelf(Opens below)) c.2 Available 31008100145453

Firstly, this paper deals with one of the most commonly experienced problems of choice in a developing country, when the decision is whether to make a large investment in hydro power now or a series of smaller investments in thermal power later. It is the purpose of this paper to set down in a systematic way a logically correct method for handling the economic comparison of alternative power developments. It deals with the problem of comparing alternative developments of a power system to supply a projected demand for power, with specific load characteristics that must be met.

ne 27/04/2018

Loans

There are no comments on this title.

to post a comment.